This project consists of a new two-story classroom building on an existing K-5 elementary school campus. The project includes 10 classrooms, restrooms on the ground level, kitchen (conveniently located adjacent to the existing multi-purpose building), and a small plaza at the front of the building for students and parents to gather. The building is a custom steel-frame modular design that was delivered with a modified design-build approach saving the District both time and money.
Location: Foster City, CA
Total Gross Building Area: 14,331 sf
Completion Date: 2015
Owner: San Mateo-Foster City School District
This project consists of a new two-story classroom building on an existing K-5 elementary school campus. The project includes 10 classrooms, restrooms on the ground level, kitchen (conveniently located adjacent to the existing multi-purpose building), and a small plaza at the front of the building for students and parents to gather. The building is a custom steel-frame modular design that was delivered with a modified design-build approach saving the District both time and money.
Location:
Foster City, CA
Total Gross Building Area: 14,331 sf
Completion Date: 2015
Owner: San Mateo-Foster City School District