Piedmont High School Alan Harvey Theater

Piedmont, CA

Replacing its 40 year-old predecessor, the 20,926 square-foot Alan Harvey Theater anchors the northeast corner of the Piedmont campus. Equipped with stage rigging, an orchestra shell, and acoustic panels, the theater can accommodate 486, including 28 orchestra seats. The stage features a sprung floor to support up to 257 performers, while a state-of-the-art control booth provides exceptional audio-visual and lighting experiences tailored to each performance. The building also houses a conference room, department office, pre-performance green room, and a versatile 1,600 square-foot drama classroom with blackout capabilities.

The theater’s design complements the historic nature of the campus and creates a welcoming entrance to the school along Magnolia Avenue.

Project Specs

Location: Piedmont, CA

Client/Owner: Piedmont Unified School District

Size: 20,926 square feet

Sustainability: ZNE Designed

Photographer: David Wakely

Project Team

General Contractor: Overaa Construction

Structural: H.D. Rueb Structural Engineers

Civil: Bellecci & Associates

Mechanical/Electrical/Plumbing: Introba

Landscape: Cupples Keller Designs

Acoustics: Salter

Fire Protection: Axiom Engineers

Theater Consultant: Apeiro Designs

Sited adjacent to the HKIT-designed STEAM Building, the theater entrance opens into a public courtyard that serves as an outdoor pre- and post-performance gathering space.

The building’s two-story light-filled lobby can host up to 416 guests during events and, with its doors open, seamlessly extends into the courtyard.